Projects for implementation

Currently, the investment portfolio of the Fund includes 55 projects in 15 branches of economy. For a period from its establishment until 1 January 2015 the Fund received 509 investment projects for a total amount of more than 2.4 billion KZT. In different years, the Fund withdrew from 9 projects with 100% return on investments for the amount of over 688 million KZT.

Plant for recycling of worn-out motor tires in Nur-Sultan
Publication date : 23.12.2019

Illustrative рhoto

1

Name of the asset

Plant for recycling of worn-out motor tires into rubber granules with various fractions

2

Location

city of Nur-Sultan, Saryarka district, 10 Orlykol St, n.p. 3Б.

3

Designated purpose

Plant for recycling of worn-out motor tires into rubber granules

4

Additional information

Productions/production output:

  • Waste disposal, in the form of scrap tires;
  • Raw materials – motor tires with various diameters.
  • The planned recycling capacity is 15,000 tons of tires per annum.
  • Actual recycling capacity - 7,500 tons of tires per annum.

Sales markets: Kazakhstan

Technology/ Equipment:

Scrap tires recycling plant, packaged filtering unit and ventilation equipment, manufactured in Germany

The benefits of the project:

  • Tires waste disposal according to non-waste cycle;
  • Production of rubber granules;
  • Infrastructure improvement.

5

Status

inactive

6

Options for cooperation

  • One-time purchase of property/in installments
  • Leasing/loan
  • Trust management of property

Photogallery

Applications are accepted at the address: Nur-Sultan, Yesil district, Mangilik El St., building 55a, Baiterek Business Center, 3rd floor, Asset Management Department, tel.: +7 (7172) 559-596 (ext. 322, 329).